Removing And Storing The Connector Plug; Attaching Your Humid Aire 3I; Filling The Water Chamber - ResMed HUMIDAIRE 3i Manual Del Usuario

Ocultar thumbs Ver también para HUMIDAIRE 3i:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93
Notes
To replace the front cap, align it with your flow generator (B-4) and push it firmly until it
clicks into place.
Remember to take the front cap with you when travelling, in case you need CPAP
therapy without a humidifier.
R
EMOVING AND STORING THE CONNECTOR PLUG
Please refer to the illustrations in section C of the illustration sheet.
Before attaching the H
generator (C-1) and attach it to the back of the docking station (C-2).
A
TTACHING YOUR
Please refer to the illustrations in section D of the illustration sheet.
1
Align your H
until they click into place (D-2).
WARNING
!
The HumidAire 3i docking station should only be connected or disconnected
when the water chamber is empty.
Water must be prevented from entering your flow generator. Do not transport
the flow generator with the HumidAire 3i attached.
2
Insert the power cord into the socket at the rear of your flow generator. Plug the other
end of the power cord into a power outlet (D-3).
Note: If your flow generator is powered via the DC input, the HumidAire 3i is not powered
and humidification output will be reduced.
3
Place the combined unit on a firm, level surface near your bed at a level lower than
your sleeping position. Ensure the surface is not sensitive to heat and/or moisture, or
use a protective mat.
CAUTION
!
Be careful not to place the unit where it can be bumped into and knocked over.
4
Connect one end of the air tubing firmly onto the air outlet of your H
and the other end to your mask (D-4).
F
ILLING THE WATER CHAMBER
Please refer to the illustrations in section E of the illustration sheet.
WARNING
!
Take care when handling your HumidAire 3i. The water and the water chamber
base may both be hot. Allow ten minutes for the heater plate and any excess water
to cool.
1
Release the cover latch (E-1) and lift the cover until it rests in the upright position (E-2).
6
A
UMID
IRE
H
A
3i
UMID
IRE
3i with your flow generator (D-1) and push them together
A
UMID
IRE
3i, remove the connector plug from your flow
A
3i
UMID
IRE
Tabla de contenido

Solución de problemas

loading

Tabla de contenido