Switch functions of the limit value outputs LV1 and LV2
▼▲
▼▲
▼▲
32

Function IN1

For dynamic analysis control or programmed plant monitoring, the
regeneration message from the controller of the water treatment plant
must be connected to IN1 (isolated contact required!). The active
status of IN1 has to be programmed according to the output function
of the controller.
In
=>
Select a normally closed or normally open contact
Press "ENTER" to confirm the entry

Water meter

It is necessary to connect a water meter to input IN2 for quantity-
dependent analysis start, for dynamic analysis control and for
monitoring the operation of the water treatment plant (plant
monitoring). Program the corresponding water meter rating.
In
, select
=>
Select the water meter rating
Press "ENTER" to confirm the entry

Plant control

In order to monitor the plant, it is possible to determine a specific
quantity of water at which the limit value should not be exceeded
(LV1 or LV2).
Example: A "GOOD" quantity of 50 m
quantity of water produced between two violations of the limit value is
less than the programmed quantity of water, either an alarm or a
message is triggered depending on the programming.
In
=>
Enter the "GOOD" quantity in m
Press "ENTER" to confirm the entry
The flashing error display "Plant control" appears.
The quantity of water for plant monitoring is reset after exceeding
LV1 or LV2, or via a signal at input IN1 (regeneration message from
the process controller), or manually in the SERVICE II menu via the
plant control RESET.
Monitoring does not occur if 0 is entered for the quantity of water
(min. GOOD quantity).
, select
=>
=>
3
has been entered. If the
, select
=>
3