Safety; Intended Use; Inverter Manager; Scope Of Delivery - SMA INVERTER MANAGER Instrucciones De Instalación

Ocultar thumbs Ver también para INVERTER MANAGER:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

SMA Solar Technology AG

2 Safety

2.1 Intended Use

The Inverter Manager is a device for monitoring and
controlling up to 42 Sunny Tripower 60 or
Sunny Highpower 75 or up to 20
Sunny Tripower Storage 60 with battery storage
system in decentralized PV system.
The I/O Box is a function interface for one Inverter
Manager. The I/O Box receives commands for grid
management services via digital signals and sends
these specifcations to the Inverter Manager.
The Inverter Manager receives the specifcations
from the I/O Box and controls all inverters in the PV
system accordingly. The Inverter Manager and the I/
O Box must only be used indoors and must only be
operated with the Sunny Tripower 60,
Sunny Tripower Storage 60 and Sunny Highpower
Peak1.
The LCS-Tool is required for commissioning and
servicing the inverters via the Inverter Manager. The
LCS-Tool is the primary user interface for the PV
system and battery storage system.
Use this product only in accordance with the
information provided in the enclosed documentation
and with the locally applicable standards and
directives. Any other application may cause personal
injury or property damage. or safety reasons, it is
not permitted to modify the product or install
components that are not explicitly recommended or
distributed by SMA for the product. Unauthorized
changes and modifcations will void all warranty
claims and the operating permission. Any use of the
product other than that described in the Intended Use
section does not qualify as appropriate.
The type label must remain permanently attached to
the product. The enclosed documentation is an
integral part of this product.
Installation Manual

3 Inverter Manager

3.1 Scope of Delivery

Check the scope of delivery of each product for
completeness and any externally visible damage.
Contact your distributor if the scope of delivery is
incomplete or damaged.
The scope of delivery may contain parts that are not
required for the installation.
igure 1:
Components included in the scope of delivery of
the Inverter Manager
Positio
Quanti
Designation
n
ty
A
1
Inverter Manager
B
2
Wall mounting brackets
C
1
Bracket for mounting on
top-hat rail (35 mm DIN rail)
D
1
Connection for electricity
supply
E
2
Bootlace ferrules
1
Connecting terminal plate for
electricity supply
G
2
Connecting terminal plates for
serial port
H
4
Screws for wall and top-hat rail
mounting
I
1
Installation manual
IMVIOBOX-IA-xx-18
2  Safety
13
Tabla de contenido
loading

Tabla de contenido