8" (203 mm)
Ø 1" (25 mm)
2. Deck-Mount Supply Installation
Remove the temporary plugs from the water supply couplings.
Construct a frame for the deck with two 1" (25 mm) holes
measuring 8" (203 mm) apart from the center of each hole.
Carefully slide the plated supply pipe through the holes.
Thread the supply pipe into the supply rough-in and tighten with
a strap wrench.
Securely strap the supply pipes to the framing below the bath
deck.
Loosen the setscrew in the flange.
Carefully slide the flange down the supply pipe so it rests on the
bath deck.
Tighten the flange setscrew.
Kohler Co.
Flange
Setscrew
5
Plated
Supply
Pipe
1008209-2-H