Kohler K-76395 Guia De Instalacion página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Plastic Washer
Steel Washer
7. Install the Bowl
NOTE: This step is easier when performed by two people.
NOTE: When mounting the bowl to the carrier be sure any
necessary water and electrical lines are accessible. Run the lines
through the vitreous on the right side of the bowl so that they can
be easily connected in the next steps.
NOTE: Be sure all gaskets are well lubricated with plumbers grease.
Reapply plumbers grease if necessary.
Confirm the gasket on the inside of the inlet elbow has correctly
engaged with the inlet pipe.
Confirm the gasket on the inside of the outlet elbow has correctly
engaged with the outlet pipe.
Carefully lift the bowl up and align the threaded rods and pipes
with the corresponding holes.
Slide the bowl onto the threaded rods, inlet pipe and outlet pipe.
Make sure the bowl fully engages the gaskets on the inlet and
outlet pipes.
Slide the bowl back until it makes contact with the wall.
Kohler Co.
Nut
11
1247364-2-A
Tabla de contenido
loading

Tabla de contenido