A Open HARDWARE FOR STEP 1.
1
B Gently lift up top HAND RAIL (1) and align with MAIN FRAME (2).
C
Remove the wire tie from the MAIN FRAME (2).
D Attach TOP HAND RAIL (1) to MAIN FRAME (2) using 1 BOLT (A), 2 flat
WASHERS (B), and 1 NUT (C) and tighten to 45.9 Nm / 33.9 lb-ft.
E
Attach TOP RAIL BRACKET (3) to TOP HAND RAIL (1) using 2 SCREWS (D).
F
Attach HAND RAIL COVERS (4) using 6 SCREWS (D) and 4 FLAT WASHERS (E).
Hardware For Step 1
Description
A
Bolt
B
Flat Washer
C
Nut
D
Screw
E
Flat Washer
2
1
6
Qty
1
2
1
8
4
D
3
A
B
A50 SHOWN
B
C
4
E
D