6 - INSTALLATION
1. Disassemble the door's locking system.
2. Measure the door, and at exactly half its width mark the
reference points on the upper crossbeam and on the ceiling to
facilitate positioning of the guide section bar.
3. Fasten the bracket E to the upper crossbeam of the door using
plugs suitable for the type of wall (ø minimum 8 mm).
4. Couple the profile to the bracket E using the pin F with the
relevant clips.
5. Assemble the perforated bars H on the profile using the
fastening brackets I. Adjust the length of the bars so the
profile is parallel to the ceiling.
6. Following the previously traced references on the ceiling,
identify the fastening points for the bars; drill and use suitable
plugs for the type of ceiling (Ø minimum 8 mm) to anchor the
automation.
7. Assemble the perforated bar Q on the pulley trolley using the
pin and the 4 screws.
Q
- 30 -
F
E