The conversion must only be carried out by a registered gas fitter using the original conversion kit!
Conversion kit contents:
No.
Part
1
Twin coil
EV1/EV2
1
Replacement of twin coil
Follow procedure below:
Isolate the boiler from the mains supply.
Otherwise there is a risk of electrocution.
- Close the gas shut-off valve.
- Remove the casing.
- Pivot the control unit downwards.
- Release the fixing screw of the ignition transformer (TGG/
TGU) or the "Molex"-plug (CGB/TGC) (see fig.1).
- Remove the ignition transformer (TGG/TGU) or the "Molex"-
plug (CGB/TGC) from the gas combination valve and release
the fixing screw of the twin coil (see fig. 2).
- Remove the defective twin coil from the gas combination
valve (see fig. 3).
- Remove the seal from the electrical plug connection of the
defective twin coil and fit it to the plug connection of the new
twin coil (see fig. 4).
- The installation of the new twin coil has to be carried out in
reverse order.
2
Control checks
Check the gas connections for tightness.
Escaping gas may cause poisoning or the risk of
explosion.
Please check:
-
nozzle pressure of TGG/TGU
-
CO
- adjustment of CGB/TGC
2
as described in the installation instructions
Installation instructions - Spare part set twin coil for gas
combination valve - part no. 86 03 317
TGG/TGU und CGB/TGC
Part no.
Pcs.
2796124
1
TGG/TGU
Fig. 1: Fixing screw of plug
TGG/TGU
Fig. 2: Fixing screw of twin coil
TGG/TGU
Fig. 3: Gas combination valve without twin coil
Fig. 4: Seal of electrical connection