- top glazing bead (f-s)
NOTE: it irecommended to cut approx. 5 cm more of the sealant
than the nominal length and then remove any remaining length
once assembly is complete.
(
16c, details 3-4) Position the glass panel on the plastic
spacers and allow it to run so that it rests against the spacers on
the vertical profile.
(
16c, detail 5) Check the spirit level of the upper glass
panel (to correct any perpendicularity errors, use spacers with a dif-
ferent thickness).
(
16c, detail 6) Install the glazing bead.
Installing the upper external covers
(
17, detail 1-2) Remove the protective film from the covers
and position them as indicated, checking their alignment (firstly,
you must insert the external covers under the small glass panel
couplers).
NOTE: the correct position is obtained by inserting the frame (see also
the "Accessories" chapter) between the cover and the aluminium profile.
(
17, detail 3-4) Once the correct position has been found,
place a line of silicone under each cover and assemble them as
indicated.
(
17, detail 6-7) Also place the silicone in the areas between:
- the small glass panels and the external covers
- the large glass panels and the front cover.
NOTE:
- (detail 5) to ensure greater stability, it is recommended to use pa-
per tape.
- remove any excess silicone from inside the covers otherwise the as-
sembly of the frame may be difficult.
Installing the heater (models with Sauna)
(
18, details 1-2) Thread the sauna (S) and bio sauna (B)
power supply cables through the wall holes, positioning them in
the conduit behind the walls.
(
18, detail 3) Draw the cables to the electrical box, thread-
ing them in the relevant cable clamps.
Connect the cables to the provided terminals, as indicated.
(
18, detail 4) Attach the heater (contained within its packag-
ing) to the base wall, following the instructions already provided.
(
19, details 1-2) Where installation of the automatic filling
tank is planned, assemble the float and fix the tank on the heater
side, as indicated.
(
19, details 3-4) Connect the supply pipe (3/4", coming
from the wall connection) to the tank, using a tap (not supplied);
then connect the tank to the heater, using the fitting (T) and the
tap (R) (supplied).
(
19, detail 5) Attach the heater to the bracket, as indicated.
(
19, detail 6-7) Use running water to wash the stones,
then dry them and place them on the heater, ensuring to leave
space between one stone and another.
Do not place the stones in layers! Always try and leave
space between stones, so that hot air coming from be-
low can circulate freely.
Installing the lower covers
(including shower wall frame)
If the shower has a door, the long cover must be repla-
ced with the one provided in the respective kit; refer to
the attached documentation.
(
20, details 1-2) Remove the protective film from the cov-
ers and position them as indicated, checking their alignment
(firstly, you must insert the "I" covers under the small glass panel
couplers).
NOTE: the correct position is obtained by inserting the frame (see
also the "Accessories" chapter) between the cover and the alumin-
ium profile.
(
20, detail 3-4) Once the correct position has been found,
place a line of silicone under each cover and assemble them as
indicated, according to the model.
(
20, detail 5-6) Also place the silicone in the areas between:
- the small glass panels and the external covers
- the large glass panels and the front cover.
NOTE:
- (detail 5) to ensure increased stability, we recommend attaching
the supports below the hinge above the external covers "I" (in the
case of the HAMMAM, we recommend placing silicone in the
holes of the cover to which the hinge is attached).
- remove any excess silicone below covers otherwise the assembly of
the wood cornice may prove difficult.
(
21, details 1-2-3) Take the shower frame and remove the
3 walls (disconnect the shower cascade on the upper wall from the
pipe coming from the mixer system).
Position the frame on the base and attach it to the adjacent verti-
cal wall dowels (T)
(
22) Caulk the base cover of the shower tray with the sili-
cone sealant and apply it as indicated.
23, details 1-2-3) Insert the profiles under the glass cou-
plers (the coupler on the profile must be positioned facing out-
wards) and rotate them so that a silicone line can be placed
along the entire area which:
- flanks the profiles of the adjacent walls,
- flanks the shower frame.