Jacuzzi sasha Manual De Instalación página 22

Ocultar thumbs Ver también para sasha:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 101
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
- (detail 6) to the side walls.
Installing the roof frame
(
12) Remove the roof frame and remove the glazing beads.
(
12a) Remove the shower roof frame (remove the protec-
tive film) and the plastic edge protectors.
Place a line of silicone on each of the plastic edge protectors and
position them as indicated, so that they are flush with the frame
edge.
(
13) Install the roof frame so that:
- (detail 1) the wood dowels on the wall are inserted into the
frame.
- (detail 2) the metal dowels are inserted into the glass profile,
- (detail 3) the metal dowels are inserted into the vertical wall
profile.
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
Subsequently, use a rubber mallet if necessary.
(
13) Attach the roof frame:
- (detail 4) to the glass profile,
- (detail 4) to the vertical wall profile,
Installing fixed glass panels
ATTENTION: in order to move the glass, use ONLY a
suitable suction lifter; the size should be suited to the
weight of the actual glass (75 kg). You must also use
suitable protective gloves.
(
14, details 1-2) Place a small amount of silicone on the
plastic spacers and position them in pairs, as indicated:
- on the base frame,
- on the vertical wall profile,
- on the glass profile,
- on the roof frame.
The spacers should be positioned against the wall profiles (part. 2).
NOTE: (detail 1) the thickness of spacers varies: any glass perpen-
dicularity errors can therefore be corrected, for example, by placing
one spacer higher than the other.
Models with screen-printed glazing:
This glass, which features near transparent areas, must
be installed according to a specified order. Therefore,
refer to the drawings attached in order to identify the
correct assemble sequence.
NOTE: the screen-printed glass side must face inwards.
(
15, details 1-2) After having measured the length, cut
sections from the sealant roll which must be applied to the:
- bottom glazing bead (f-i)
- vertical glazing bead (f-i)
- top glazing bead (f-i)
NOTE: it is recommended to cut approx. 5 cm more of the sealant
than the nominal length and then remove any remaining length
once assembly is complete.
(
15, details 3-4) Position the small glass panel on the plas-
tic spacers and allow it to run so that it rests against the spacers
on the vertical profile.
(
15, detail 5) Check the spirit level of the roof panel (to correct
any perpendicularity errors, use spacers with a different thickness).
(
15, detail 6) Install the glazing beads
(
16, details 1-2) After having measured the length, cut
some sections from the sealant roll which must be applied to the:
- bottom glazing bead (f-i)
- vertical glazing bead (f-v)
- top glazing bead (f-s)
NOTE: it is recommended to cut approx. 5 cm more of the sealant
than the nominal length and then remove any remaining length
once assembly is complete.
(
16, details 3-4) Position the large glass panel on the plas-
tic spacers and allow it to run so that it rests against the spacers
on the vertical profile.
(
16, detail 5) Check the spirit level of the roof panel (to correct
any perpendicularity errors, use spacers with a different thickness).
(
16, detail 6) Install the glazing bead (even on doors, pre-
sent on base and ceiling frames, if removed during their installa-
tion).
(
16a, detail 1) Remove the upper glass frame and then re-
move the glazing bead.
(
16a, details 2-3) Install the frame in such a way so the
metal dowels are inserted into the panel profile (subsequently, use
a rubber mallet if necessary).
NOTE: these dowels are adjustable so that any positioning errors
can be corrected.
(16a, detail 4) Attach the frame as indicated.
(detail 5) ATTENTION: ensure that you support the
frame until the glass is inserted.
(
16b, details 1-2) Place a small amount of silicone on the
plastic spacers and position them in pairs, as indicated:
- on the lower glass frame,
- on the vertical wall profile,
- on the upper glass frame.
The spacers should be positioned against the wall profiles.
(
16c, details 1-2) After having measured the length, cut some
sections from the sealant roll which must be applied to the:
- bottom glazing bead (f-i)
- vertical glazing bead (f-v)
22
Tabla de contenido
loading

Este manual también es adecuado para:

Sasha 2.0

Tabla de contenido