How to Fix
Hanging bolt
(W3/8 or M10)
Nut
(W3/8 or M10)
Spring washer
(M10)
• The following parts are local purchasing.
① Hanging Bolt
- W 3/8 or M10
② Nut
- W 3/8 or M10
③ Spring Washer - M10
④ Plate Washer - M10
Wiring Connection
• Open the control box cover and connect the remote control cord and indoor power wires.
TQ/TR series
Conduit connection
• Remove the bushing rubber product attached on the indoor unit.
• Join the conduit and the conduit bracket together using nut.
• Set the connecting cable into the terminal block of indoor unit, and tighten set screw to lock the
conduit bracket to the indoor unit.
Keep the length of the bolt
from the bracket to 1-9/16 inch(40mm)
Flat washer for M10
(accessory)
Flat washer for M10
(accessory)
Nut
(W3/8 or M10)
Terminal Block of Indoor Unit
1(L1)
2(L2)
Connected to outdoor unit
Ductless Ventilation Kit (DVKA,DVKB)
Conduit bracket
Screw
Air Conditioner body
Ceiling board
Keep the length of 1.22~1.34inch(31~34mm)
between the air conditioner bottom surfac
e and the ceiling surface
Paper model
for installation
CAUTION : Tighten the nut and bolt to
prevent unit from falling off.
3
4
5
TO AIR
FRESH
KIT
Connecting Cable
Conduit
Installation
Ceiling
Ceiling board
Set screw of
paper model (4 pieces)
Open the ceiling board
along the outer edge of the
paper model
Installation Manual 15