Installation Process - Risco Industrial LuNAR DT AM Grade 3 Guia De Instalacion

Detector para montaje en techos altos
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Installation Process:

To open the detector (Figure 1), remove the cover by inserting a screwdriver (1) in the recess
between the detector's protection cap and the cover. The cover will remain attached to the base of
the detector.
Using a Philips screwdriver, release the upper cover screw (2) and gently pull upward the detector's
upper cover.
FIGURE 1
8
2
Industrial LuNAR DT AM Grade 3 Installation Guide
1
Tabla de contenido
loading

Tabla de contenido