Assembling The Pump; Power Supply; Mains Operation; Power Bank - NUK BP7 First Choice Manual Del Usario

Ocultar thumbs Ver también para BP7 First Choice:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
10520xxx_Rev400_GA_NUK Mipu Tischpumpe BP7.book Seite 30 Donnerstag, 5. April 2018 12:52 12
1. Assemble the device as shown in figure B.
Note: Make sure the silicone cushion 10 fits
snugly in the breast shield 9 and the lip
Notes:
• If the power supply supplies a current
less than 2 amperes, an error message
will appear in the display when the pump
is switched on and you will hear a beep.
Nature Sense model display:
Symbol
37
+
First Choice
model display:
• No further check of the power supply is
made once the device is in operation.

7.1 Mains operation

Only the mains adapter included in the
delivery
package
must
operation from mains power.

8.1 Expressing milk

Warning! As hygiene is particularly
important, please wash your hands
thoroughly before expressing your
milk, and read the information in
"11 Storing Milk" on page 33.

6 Assembling the pump

valve 11 is properly mounted, as the pump
can otherwise draw in air, which will prevent it
from working properly.

7 Power supply

7.2 Power bank

A power bank is not included in the delivery
package.
The power bank must provide an output
current of at least 2 amperes. Otherwise,
an error will be visually and audibly
indicated when the pump is switched on.
7.3 Battery operation
If no mains adapter is connected, the device
will run off the integrated battery. To this
end, the battery must be adequately
charged (at least 2 bars shown in battery
charge symbol), so that at least one
pumping session can be completed.
The battery charge state is displayed by the
battery charge symbol
Fully charged (4 bars in the battery charge
symbol 36), the battery power will last for
be
used
for
three full pumping sessions of 30 minutes
each.
Note: While connected to mains power or a
power bank, the battery will also be charged
during operation.

8 Operation

1. Assemble the pump (see "6 Assembling
Start-up mode
2. Switch on the pump unit 3 by pressing
30
Use the USB cable 14 to connect the
power bank with the USB port 2 of the
pump.
Sense model only)
the pump" on page 30).
the master power switch
This places the pump into start-up mode.
+
First Choice
model: display 29 is lit.
(Nature
36.
26.
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Bp7 nature sense

Tabla de contenido