Maximum motor power during battery operation
During battery operation, the controller is powered with a lower voltage
compared to mains power. For this reason, the power of the motors is
reduced compared to normal operation and may not be sufficient to
move the gate panels effectively.
This menu allows you to activate the motors at their maximum power
during battery operation.
no
Motor power at the parameters set in the
menus
Si
Maximum motor power
Start off
When the gate is standstill and it begins moving, the initial inertia must
be faced, therefore, if your gate is quite heavy, its doors could not
SPUn
move.
In case the
(pickup) function is activated, for the first 2 seconds of
motion of each door, the control unit will ignore both
values and it will give motors the maximum power command in order to
overcome the gate inertia.
Starting ramp
In order not to stress too much the motor, when the motion starts the
power is gradually increased, until reached the set value or 100% if the
take-off is enabled.
Higher is the set value, longer the length of time of the ramp, that is the
time necessary to reach the value of nominal power.
Adjusting the obstacle sensor on motor 1
This menu allows adjustment of the sensitivity of the obstacle sensor for
motor 1. When the current absorbed by the motor exceeds the value
set, the control unit detects an alarm.
For sensor operation, please refer to the dedicated section (page 47)
Adjusting the obstacle sensor on motor 2
This menu allows adjustment of the sensitivity of the obstacle sensor for
motor 2. When the current absorbed by the motor exceeds the value
set, the control unit detects an alarm.
For sensor operation, please refer to the dedicated section (page 47)