Prepare The Site - Kohler K-5558 Guía De Instalación Y Cuidado

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Provide clearance
from wall.
6" (152 mm) from Floor

2. Prepare the Site

NOTE: This section continues the installation described in the steam generator installation instructions.
Refer to the steam generator installation instructions for more information, if needed.
NOTE: If two steam heads are used, there must be at least 12-1/2" (318 mm) between the center of each
hole. The steam heads do not need to be located on the same wall. Two steam heads can be mounted on
different walls to improve steam distribution.
Install the finished wall.
Drill or cut a 2-1/2" (64 mm) hole centered around the elbow in the wall.
Mark the temporary pipe nipple at the finished wall surface.
Remove the temporary pipe nipple from the elbow.
Kohler Co.
Wall Stud
2-1/2" (64 mm)
5
Mark the nipple even
with finished wall.
Temporary
Nipple
Wall Stud
1230489-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-5557

Tabla de contenido