ECOFOREST ecoSMART e-system Manual Instalador página 67

Ocultar thumbs Ver también para ecoSMART e-system:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

1. The bottom module is the BMS (Battery Management System) which
communicates directly with the inverter´s charge controller. The rest of the
modules must be installed in the upper cabinets.
2. Put the battery into the cabinet using the two side handlers.
3. Drive the 4 pcs screws.
4. Connect the cables between battery modules.
5. Connect the cables to the inverter.
6. Connect the grounding cable to the common ground screw.
Illustration 3.13. Example of assembly and wiring of a cascade of lithium-ion modules.
Installer manual ecoSMART e-system
65
Tabla de contenido
loading

Tabla de contenido