1. The bottom module is the BMS (Battery Management System) which
communicates directly with the inverter´s charge controller. The rest of the
modules must be installed in the upper cabinets.
2. Put the battery into the cabinet using the two side handlers.
3. Drive the 4 pcs screws.
4. Connect the cables between battery modules.
5. Connect the cables to the inverter.
6. Connect the grounding cable to the common ground screw.
Illustration 3.13. Example of assembly and wiring of a cascade of lithium-ion modules.
Installer manual ecoSMART e-system
65