IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
PREPARE THE OPENING
Installation over a GE Applainces/
Monogram Oven:
30"
17-1/2"
45-1/4"
Min.
* If you are replacing a GE Appliances/
Monogram electric double oven with the
combined installation of an Advantium/
Convection 120 and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2" minimum shown.
Standard Installation Preparation
(CONT.)
Construct
23-1/2"
solid bottom
- Min. 3/8"
plywood
supported
on all four sides.
Must be able to
support weight
25-1/4"
of oven and
contents.
2" Min.
(3" Recommended)
Per Oven
Requirement
PREPARE THE OPENING
Installation over a GE Appliances/
Monogram Oven and Warming Drawer:
30"
17-1/2"
45-1/4"
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location does not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
6
(CONT.)
Construct
solid bottom -
23-1/2"
Min. 3/8" plywood
supported
on all four sides.
Must be able to
support weight
25-1/4"
of oven and
contents.
2" Min.
(3" Recommended)
Per Oven
Requirement
2" Min.
(3" Recommended)
Per Warming
Drawer
Requirement
For personal safety, the