Honeywell PS1201A00 Instrucciones De Instalación página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PS1201A00, PS1202A00 AND PS2401A00 REPLACEMENT POWER SUPPLIES
STEP 2:
Install new power supply.
BLACK
4
BLACK
5
JUMPER
1 INTERLOCK SWITCH.
2 SHORTING BAR FOR OZONE REDUCTION.
3 AIRFLOW SWITCH DISABLE JUMPER, R16.
AIRFLOW SWITCH PLUG, J3.
4 NEON LIGHT.
5 OPTIONAL W8600F AIR CLEANER MONITOR.
6 JUMPER LOCATION FOR IONIZER CURRENT SELECTION.
7 JUMPER LOCATION FOR IONIZER VOLTAGE SELECTION.
a. Position the P5 shorting bar for the size air cleaner you have.
b. Wire the power cord ground lead to the ground choke assembly using a wire
nut. Secure ground connection to the green ground screw on the wiring
compartment barrier.
CHECKOUT
With all components in place, turn on the air cleaner switch and energize the system
blower. Check the following operation:
1. Be sure the neon light is on.
2. Turn off the system blower. The neon light should go off.
3. Turn the system blower back on. The neon light should come back on.
4. With the air cleaner energized, push the test button. A snapping sound indicates
that collector section is energized.
5. With a multispeed blower, repeat steps 2 through 4.
6. If operation is not as described, refer to Troubleshooting and Service section.
P3
U4
J8
2
P5
P4
0.25mA
0.9mA
1.05mA
P8
6
7
1.29mA
1.65mA
J4
2.1mA
POWER SUPPLY
3
J4
ORANGE
GRAY
VIOLET
BLACK
W4 W2 W1 W3
AIRFLOW SWITCH BOARD
BLACK COLLECTOR
RED IONIZER
T1
BROWN
P2
P1
BLACK
1
BLACK
5
TEST
BUTTON
RED
BLACK
BLACK
CONTACT
BOARD
GREEN
GROUND
CHOKE
GREEN
M32904A
69-2673EFS—01
Tabla de contenido
loading

Este manual también es adecuado para:

Ps1202a00Ps2401a00

Tabla de contenido