Pressure-Resistant (Closed) Outlet; Installations; Installation Instructions - clage MBH 3 Instrucciones De Operación E Instalación

Ocultar thumbs Ver también para MBH 3:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 78
MBH 3..7
Installation
2.1.2 Pressure-resistant (closed) outlet installations
EN
Electrical connection with
Fig. 4: "Pressure-resistant (closed) installation with standard tap" (dimensions in mm)

2.2 Installation instructions

The heater is installed directly to the connecting pipes of the tap. We guarantee trouble-free
operation of the instantaneous water heater only if CLAGE fittings and accessories are used.
Note the following during installation:
• Installation must comply with DIN VDE 0100 and EN 806 and with the statutory regulations
of the country and the provisions of the local electricity and water supply company.
• Check the technical data and information on the rating plate.
• Easy access to the instantaneous water heater must be guaranteed at all times for mainte-
nance purposes. An separate shut-off valve must be installed.
mains power cable
(shorten if necessary)
Insert the special tap aerator:
3,5 / 4,4 kW: CSP 3
5,7 / 6,5 kW: CSP 6
Angle valve outlet G ⅜"
22
Tabla de contenido
loading

Este manual también es adecuado para:

Mbh 4Mbh 6Mbh 7

Tabla de contenido