Suspending The Indoor Unit - Panasonic S-22MU1E5 Instrucciones De Instalación

Acondicionador de aire con sistema vrf - para refrigerante r410a
Ocultar thumbs Ver también para S-22MU1E5:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 171
Pana_indoor_336012_Eng.indb 11
■ Ceiling Type (T1 Type)
3-6. Required Minimum Space for Installation and
Service
(1) Dimensions of suspension bolt pitch and unit
Length
A
B
Type
36, 45, 56
855
910
73
1125
1180
106, 140
1540
1595
(2) Refrigerant tubing • drain hose position
Left side
Rear (Figure shows view from front)
251
84
Left drain position
Closed with rubber stopper at time of shipment.
(3) Unit opening position (Refrigerant tubing • drain hose • power inlet port • remote controller wiring inlet port)
Left-side drain hose
123
outlet port
*3
Remote controller
wiring inlet port
(ø30, knock-out)
Knock-out
*1
Side panel
Outside air intake duct connection port
(ø100, knock-out)
*3
Remote controller wiring
inlet port
(ø30, rubber grommet on
right side only)
Power inlet port
(ø40, knock-out)
Rear tubing hole
Left-side drain
84
hose outlet port
B
Ceiling side
C
210
210
27.5
27.5
A
210
(Suspension bolt pitch)
Unit: mm
Unit: mm
Right side
75
97
Liquid
tubing
Gas tubing
146
Right drain position
Top outlet port
216
Right-side drain
110
76
hose outlet port
Power inlet port
(ø40, knock-out)
Position of plate
Side panel
*2
inside side panel
*1 Use a compass saw, jig saw or similar tool
Rear outlet port
and cut along the indented portion of the side
panel.
*2 If the optional drain up kit is installed, this
262
becomes the upper tubing outlet port.
125
72
For details, refer to the manual for the
optional part.
*3 If the remote controller wiring inlet port is
changed to the left side or the left top side,
relocate the rubber grommet to the left side.
Use aluminum tape or similar material to seal
the unused inlet port on the right side.
347
Unit: mm
13
2011/01/12 13:55:48
Pana_indoor_336012_Eng.indb 12
(4) Wall and ceiling side opening position
C
Figure shows view from front.
Air intake
ø100 wall side
90
opening (for left-
side drain hose)
Air
Figure shows view from top.
Fig. 3-12
Wall
216
ø100 ceiling
(Liquid tubing •
opening
Gas tubing)
ø100 ceiling
opening
* If the optional drain up kit is installed, create a ø100 hole
along the dotted line (part marked with * in fi gure).
161

3-7. Suspending the Indoor Unit

251
Unit: mm
(1) Place the full-scale diagram (supplied) on the ceiling at the
Fig. 3-13
location where you want to install the indoor unit. Use a
pencil to mark the drill holes (Fig. 3-16).
Full-scale installation
diagram
*1
NOTE
Since the diagram is made of paper, it may shrink or stretch
slightly because of high temperature or humidity. For this
reason, before drilling the holes maintain the correct dimensions
between the markings.
(2) Drill holes at the 4 points indicated on the full-scale
diagram.
(3) Depending on the ceiling type:
a) Insert suspension bolts (Fig. 3-17).
or
b) Use existing ceiling supports or construct a suitable
support (Fig. 3-18).
Hole-in-anchor
Hole-in-plug
Suspension bolt (M10 or 3/8")
(field supply)
Fig. 3-14
WARNING
It is important that you use extreme care in supporting
the indoor unit from the ceiling. Ensure that the ceiling is
strong enough to support the weight of the unit. Before
Ceiling
hanging the ceiling unit, test the strength of each attached
suspension bolt.
ø100 wall
(4) Screw in the suspension bolts, allowing them to protrude
side opening
135
from the ceiling (Figs. 3-17 and 3-18). The distance of
each exposed bolt must be of equal length within 50 mm.
(Fig. 3-19)
*
125
Unit: mm
(5) Before suspending the indoor unit, remove the 2 or 3
screws on the latch of the air-intake grilles, open the
grilles, and remove them by pushing the claws of the
Fig. 3-15
hinges (Fig. 3-20). Then remove both side panels sliding
them along the unit toward the front after removing the 2
attachment screws. (Fig. 3-21)
Pull out the air-intake grille
pushing claws of the hinges
Ceiling
Wall
Fig. 3-16
Insert
Concrete
(6) Carry out the preparation for suspending the indoor unit.
The suspension method varies depending on whether
there is a suspended ceiling or not. (Figs. 3-22 and 3-23)
(7) Suspend the indoor unit as follows:
a) Mount 1 washer and 2 hexagonal nuts on each
suspension bolt (Fig. 3-24).
Fig. 3-17
Ceiling tiles
Unit
Ceiling support
A
A
Fig. 3-18
14
2011/01/12 13:55:49
Unit
Ceiling
surface
Fixture
Fig. 3-19
Hinge
Screw
Latch
Slide
Air-intake grille
Fig. 3-20
Slide toward
front side
Side panel
Fig. 3-21
Suspension bolt
(field supply)
Ceiling surface
Washer (supplied)
Double nut
(field supply)
Fixture
Fig. 3-22
Tabla de contenido
loading

Tabla de contenido