Jumper Configuration Instructions (Opl Micro Control Models Only) - Alliance Laundry Systems JT37CE Instalación Operación Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

JUMPER CONFIGURATION
INSTRUCTIONS (OPL MICRO
CONTROL MODELS ONLY)
Refer to Figure 11
.
Changing the transformer configuration jumper is
required if any of the following apply:
• You have 208V service and are connecting a gas or
steam model rated for 208 or 240V.
• You have 415V service and are connecting a gas or
steam model rated for 380 or 415V.
To configure your 208V or 240V tumbler for 208V
operation, you must remove the 240V configuration
jumper located in the contactor box and replace it with
the 208V jumper supplied with the information packet.
This must be done prior to supplying power to machine.
Failure to install proper configuration jumper may result
in damage to sensitive electronic controls and may void
warranty.
To configure your 380V or 415V tumbler for 415V
operation, you must remove the 380V configuration
jumper located in the contactor box and replace it with
the 415V jumper supplied with the information packet.
This must be done prior to supplying power to machine.
Failure to install proper configuration jumper may result
in damage to sensitive electronic controls and may void
warranty.
34
CONTACTOR
BOX
JUMPER
Figure 11
FERRITE RING INSTALLATION
(GAS AND STEAM OPL MICRO
CONTROL MODELS ONLY)
Refer to Figure 11.
The ferrite ring provided in the information packet must
be installed over the power leads during connection of
electrical service. The ferrite protects the sensitive
electronic controls from destructive electrical
disturbances which may be present on power lines to the
machine. Failure to properly install the ferrite ring may
result in damage to the electronic controls and will void
control warranty.
Installation Instructions:
1. Immediately after connection of power leads and
before applying power to machine, locate each of the
incoming service leads including ground.
2. Snap the ferrite ring closed over all of the service
leads inside of the contactor box as shown. It is
important that the ferrite ring be installed inside the
contactor box as shown. Do not install the ferrite
outside of the box or other area. Make sure that
service leads are in the center of the ferrite before
closing the ring so not to pinch or damage leads.
FERRITE
RING
T225SE1A
70369801

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Jt37cgJt37cshJt37cslJt37egJt50cg1Jt50eg1

Tabla de contenido