Electrical Installation Set-Up - BFT MOOVI 30S Instrucciones De Uso Y De Instalacion

Ocultar thumbs Ver también para MOOVI 30S:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
that it protrudes about 20mm from the floor (fig.2).
- Fill the hole with concrete, checking the position of the base in both
directions by means of a level, and let the cement harden.
5) FITTING OF THE ACTUATOR
WARNING! The barrier must be exclusively used for vehicles to
drive through. Pedestrians must not walk within the operator
manoeuvring area. An appropriate pedestrian passageway must be
provided for.
The passageway must be suitably indicated by means of the warning
signs illustrated in Fig.9.
WARNING: before opening the door, make sure that the spring has
been unloaded (rod at 43°). The door of the box must face the inside of
the property. When standing in the middle of the passageway, if the box
is on the left the barrier opens to the left, and if the box is on the right the
barrier opens to the right.
The actuator is always supplied for left-hand side fitting.
5.1) Left-hand fitting
- Fix the operator to the foundation base and secure it by means of nuts
M12 (fig.3 ref.1). The door of the box must face towards the inside of the
property.
- The upper surface of the operator is slightly tilted so as to prevent any
rain water from being trapped there. Therefore use a side surface to
check correct positioning by means of a level (fig.2).
- Balance the boom as described in relevant paragraph 6.
5.2)Right-hand fitting
Some internal members need to be moved, with reference to fig. 3 and
the following procedure:
A) Fix the box to the foundation base and lock it in position using M12
nuts.
B) Ensure that the balancing spring is in the opening position (stretched
spring - fig.4).
C) Completely slacken the spring stretcher (fig.3/ref. 2) until the screw
(fig. 4/ref.3) anchoring it to the bottom of the box can be removed.
D) Remove the bar locking bracket (fig.3/ref.4) and slacken the screw
(fig. 3/ref.5) by means of a CH19 socket spanner until the lever can
be rota-ted (fig.3/ref.6).
E) Rotate the lever (fig.3/ref.6) by 180° and fasten it into the correct posi-
tion.
F) Tighten the tie rod (fig. 3/ref.5) blocking the lever (fig.3/ref.6) by means
of a torque wrench set at about 80 N/m.
G) Bring the release key (fig.5) to the manual operation position and
manually rotate the lever (fig.3/ref.6) downwards by 90° (fig.6) so as
to bring the barrier to the right-hand opening position.
H) Lock the spring stretcher (fig.3/ref.2) into position (fig.3/ref.Dx) with
the screw and self-locking nut.
I) Adjust the spring stretcher (fig.3/ref.2) until the spring comes under
tension.
L) Refit and partially fix the U bolt (fig.3/ref.4) holding the bar to the actua-
tor in the opening position.
M)
Carry out bar balancing as described in paragraph 6.
N) Invert the limit switch connections and the motor drive connections
insi-de the control unit (Fig.16), with reference to the instructions regar-
ding the existing control unit. Fig.7 shows a diagram highlighting the
connections to be inverted.
5.3) Fitting of the metal mass detector device
A DIN bar, which allows the DIN module to be connected, is fitted to the
versions suitable for the use of a mass detector. For connection, refer
to the relevant instruction manual. In the case where the bar balancing
device hinders the adjustment of this device (left-hand barrier), remove it
from its socket, carry out the adjustment and then reposition it.
5.4) FITTING THE FLASHING LIGHT (FIG 20)
Complete assembly and wiring as directed in instructions provided for
the flashing light
5.5) FITTING THE PHOTOCELL (FIG 21).
Complete assembly as directed in instructions provided for the photocell
5.6) Moovi accessories: boom length limits and balancing (Fig.22)
5.6.1) Moovi 30RMM and Moovi 50RMM
All barriers belonging to the MOOVI series are equipped with a hooking
bracket with 3 securing points located on the device for boom balancing
(Fig. 22 - ref. A points A-B-C).
The ideal securing point for correct balancing of the boom must be
chosen according to the barrier type and to the length of the boom and
INSTALLATION MANUAL
accessories installed.
Tab.1 of Fig.22 shows the weight expressed in kgs by linear meter (kg/m)
for each accessory.
When the supporting leg Moovi GA AQ AT/ GAMA AQ is used, it is neces-
sary to calculate the arbitrary weight in Kg/m, using the following formula:
where L stands for the length of the boom.
Then proceed as follows:
1) Sum up the total linear weight of the accessories installed (including
boom weight).
2) Find the crossing point between the length of the boom and the total
weight of the accessories on the diagram, making reference to the
MOOVI model.
3) The point found in this way will indicate the correct hooking point (A-
B-C).
Example
MOOVI 60 with:
(boom measuring 4,0m + BIR + GAMA AQ AT +1PCA N).
(1,028+0,510+(1,2/4,0)+0,160)= 1,97
The crossing point between value 1,97 and boom length equal to 4,0 is
within the "A" area of MOOVI 60 graph. "A" hooking point will therefore
be suitable for correct boom balancing.
Calibrate the spring as described in paragraph 6.
WARNING!:
The securing points marked with A and B can be used with MOOVI
60RMM only.
The securing point marked with C can be used with MOOVI 30S/30RMM
only.
If the point found is within the crossed area that means that installation
is not possible and it is necessary to shorten the boom or reduce the
number of accessories.
If no accessory is used, only use the weight of the "PA" boom to find the
securing point.
5.6.2) Moovi 30S
For Moovi 30S model, observe the following:
Max. boom length:
Hooking point:
Accessories that can be used without shortening the boom: BIR - PCA
N - Kit Light
Accessories that cannot be used: GA AQ AT/GAMA AQ AT - SB
6) BAR BALANCING (Fig.8)
- Activate the emergency release (fig.13).
- Position the bar at about 45° (fig.8). The bar must remain still.
- If the bar tends to open, unload the spring by operating on the "T" tie
rod.
- If the bar tends to close, load the spring by operating on the "T" tie rod.
- In both cases, load or unload the spring until the bar remains still at
about 45°.
- Reset the motorised operation by rotating the release key to the op-
posite direction (fig.13).
WARNING! During the closing operation, the balancing spring must never
be reduced to a pack (be totally compressed). Fig.8 indicates the position
where the minimum value of the compressed spring is measured with the
rod in the opening (vertical bar) position.

7) ELECTRICAL INSTALLATION SET-UP

WARNING: before opening the door, make sure that the spring has
been unloaded (rod at 43°). Set up the electrical installation (fig. 9) with
reference to the current regu-lations for electrical installations CEI64-8,
IEC364, in conformity with HD384 and other national standards. Keep
the mains power supply con-nections definitely separate from the service
connections (photocells, elec-tric edges, control devices etc.).
Warning! For connection to the mains, use a multipolar cable having
minimum 3x1.5mm
mentioned regulations (for example, if the cable is not protected, it
must be at least equal to H07 RN-F, whereas if it is protected it must
be at least equal to H07 VV-F with a 3x1.5 sq mm
Connect the control and safety devices in conformity with the previously
mentioned installation standards. Fig.9 shows the number of connections
and section for a 100m length of power supply cables; for greater lengths,
calculate the section for the true automation load. When the auxiliary
connections exceed 50-metre lengths or go through critical disturbance
areas, it is recommended to decouple the control and safety devices by
means of suitable relays.
The main automation components are (fig.9):
I)
Type-approved adequately rated omnipolar circuit-breaker with
at least 3,5 mm contact opening, provided with protection against
Kg/m = 1,2/L
3m
C
cross section and complying with the previously
2
MOOVI 30S-30RMM-60RMM Ver. 01 -
ENGLISH
cross section).
2
17
Tabla de contenido
loading

Este manual también es adecuado para:

Moovi 30 rmmMoovi 60 rmm

Tabla de contenido