Operator's Manual
Operating Instructions
Controls
Power On/Off Switch
Plug hospital grade Power Cord into a grounded "Hospital Grade" or "Hospital Use"
receptacle to ensure grounding reliability.
Press Main Power Switch ON (I pressed in).
The lamp will continue to operate until the power switch is moved to the OFF position (O
pressed in). If the lamp cannot be started or stops operating see Troubleshooting.
Note
Fiber Port
To increase the versatility and applicability of use, the CL Series light sources are
designed to use either a Micro Link
Multi Link™ Expansion Port.
Table 1. Cable Compatibility Table
For cables with no Multi Link™ Expansion Port required:
1.
Close the light attenuator or turn the Light Source off.
2. Connect the instrument end of the Micro Link
instrument.
It is normal to hear clicking (10 pulses or less) before the lamp is started.
To insure proper operation, wait thirty (30) seconds between on/off cycles.
Multi Link™ Port
®
Welch Allyn Micro Link
Fiber
Karl Storz
Olympus
CL100 / CL300 Surgical Illuminator
®
Fiber or a fiber bundle via the Multi Link™ Port and
Multi Link™ Expansion Port
Wolf, Dyonics
®
Fiber or fiber bundle to the
ACMI
7