Connect T O Water Line; Connect The Water Supply - Kenmore 595.68045 800 Serie Manual De Uso Y Cuidado

Refrigerador con congelador en la parte inferior
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Read alldirections before y oubegin.
IMPORTANT:
Ifyouturn therefrigerator
onbefore t hewater l ine
isconnected, turntheicemaker OFE
Connect
t o Water Line
1. Unplug refrigerator or disconnect
power.
2. Turn OFF main water supply. Turn ON nearest faucet long
enough to clear line of water.
3. Find a 1/2"to 1V4" (12.7 mm to 31.8 mm) vertical cold water
pipe near the refrigerator.
IMPORTANT:
4.
5.
Make sure it is a cold water pipe.
Horizontal pipe will work, but the following procedure
must be followed: Drill on the top side of the pipe, not the
bottom. This will help keep water away from the drill. This
also keeps normal sediment from collecting in the valve.
Determine the length of copper tubing you need. Measure
from the connection on the lower right rear of the refrigerator
to the water pipe. Add 7 ft (2.1 m) to allow for cleaning. Use
1/4"(6.35 mm) O.D. (outside diameter) copper tubing. Be sure
both ends of copper tubing are cut square.
Using a cordless drill, drill a 1/4"hole in the cold water pipe
you have selected.
B
C
D
E
F
G
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression
nut
E. Compression
sleeve
F. Shutoff
valve
G. Packing
nut
6. Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the 1/4"drilled hole
in the water pipe and that the washer is under the pipe clamp.
Tighten the packing nut. Tighten the pipe clamp screws
slowly and evenly so the washer makes a watertight seal. Do
not overtighten or you may crush the copper tubing.
7. Slip the compression
sleeve and compression
nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression
nut
onto outlet end with adjustable wrench. Do not overtighten.
8. Place the free end of the tubing in a container or sink, and
turn ON the main water supply. Flush the tubing until water is
clear. Turn OFF the shutoff valve on the water pipe.
Connect
to Refrigerator
1. Remove plastic cap from water valve inlet port. Attach the
copper tube to the valve inlet using a compression
nut and
sleeve as shown. Tighten the compression
nut. Do not
overtighten. Confirm copper tubing is secure by pulling on
copper tubing.
2. Create a service loop with the copper tubing. Avoid kinks
when coiling the copper tubing. Secure copper tubing to
refrigerator cabinet with a "P" clamp.
A
C
D
E
@
@
3.
A. Copper tubing
D. Compression
sleeve
B. "P" clamp
E. Water valve inlet port
C. Compression
nut
Turn on water supply to refrigerator and check for leaks.
Correct any leaks.
Complete the Installation
Electrical
Shock Hazard
Plug into a grounded
3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension
cord.
Failure to follow these instructions can result in death,
fire, or electrical
shock.
1. Plug into a grounded 3 prong outlet.
NOTE: Allow 24 hours to produce the first batch of ice. Discard
the first three batches of ice produced. Allow 3 days to
completely fill the ice container.
6

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido