ENGLISH
STANDARD RECOVERY SETUP
System
1
Manifold Gauge Set
2
Recovery Machine
3
DOT Cylinder
4
WARNING: Before using your machine, read all Safety and Warnings and
Setup/Pre-Operation
•
•
•
•
•
•
•
• Turn the machine knob to the Recover position.
• Slowly open manifold high side valve.
•
• Open recovery cylinder vapor port.
• If using an empty tank, allow pressures to approach equilibrium before starting
the machine.
• Throttle back the knob to prevent slugging then, start the machine by pressing
the Start/ Stop button.
•
• After liquid has been recovered, slowly open the manifold low side. Vapor
•
(-20inHG)
• Stop the machine, and wait five minutes.
12
12
Cylinder Vapor Port
5
Refrigeration Hose
6
Refrigeration Scale
7
Refrigeration Scale Hand Held
8