Norlake Kold Locker Serie Manual De Instalación página 22

Cámara frigorifica
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Total Restaurant Supply - https://totalsupply1.com - Toll Free 1-800-944-9304 - Local 507-288-9454
W
-i
i
-W
& c
P
e
alk
n
nsTallaTion
all
eilinG
anel
RecTion
2940 Hwy 14 W, Rochester, MN 55901
If the first corner panel is supported by a 1" vinyl
sealer (screed), seek assistance to support the
corner panel in a vertical position until succeeding
wall panels are installed. Wall and corner panels
do not lock to the vinyl sealer (screed).
Select the next panel as indicated on the floor
plan and position it on the floor or sealer (screed)
close enough to the first panel installed so that
section latch engagement is possible.
Making sure that the two panels are perfectly
aligned at the TOP EDGE and that the VERTICAL
JOINT of the two panels are perfectly flush, turn
the section latches on the vertical edge of the panel until they are completely
engaged.
IMPORTANT! Insist that the top edges of the adjoining panels are aligned
perfectly.
Correct
If misalignment is encountered, merely lift the lowest panel edge while
locking to achieve alignment and, when all latches are engaged, permit the
locked panels to resume their normal position on the walk-in floor or sealer
(screed).
dO NOT SHORT-CUT! TAKE ENOUGH TIME TO PROPERLy ALIGN ALL
Misalignment
SECTIONS.
20
© 2014 Nor-Lake, Inc 10/14 Rev. G 132617
Tabla de contenido
loading

Tabla de contenido