Total Restaurant Supply - https://totalsupply1.com - Toll Free 1-800-944-9304 - Local 507-288-9454
WALK-IN INSTALLATION
Wall & Ceiling Panel Erection
The installation instructions that follow apply to any walk-in cooler or
freezer where the wall panels are supported either by foamed walk-in
floor panels or by a floor sealer (screed) assembly which has been
accurately located and properly leveled. NOTE: The procedure for
erecting wall and ceiling panels will be identical in all cases. NOTE:
The walls do not lock to vinyl sealers, but will lock to foam sealers when
used.
To aid in the erection process, the floor plan furnished with your walk-in
has part numbers listed for each wall, corner, ceiling and floor section.
Match the part number on the floor plan to the label on the interior of
each panel to determine the current placement for each panel.
Notice, also, that the section latch access holes on the vertical edge of
the panel are always on the interior of the panel.
Position the corner panel in the
proper location on the walk-in
floor or vinyl screed assembly
and, IF THE WALK-IN HAS A
FLOOR, flush the corner panel
with the corner of the floor panel
in both directions and lock it
securely to the floor panel.
19
W
-i
i
alk
n
nsTallaTion
2940 Hwy 14 W, Rochester, MN 55901
-W
& c
all
eilinG
Select the first panel to be installed,
normally begin with a CORNER PANEL.
Notice that the panel is labeled "Top"
along with a part number indicating that
when the panel is in its proper position,
the labeled end will be up.
© 2014 Nor-Lake, Inc 10/14 Rev. G 132617
P
e
anel
RecTion