EdilKamin LAGUNA M 25 Instalación Uso Y Mantenimiento página 76

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 137
WARNINGS BEFORE START-UP
• Installation exclusively includes connection to
a chimney flue. For any complex and articulated
installation, contact the authorised EDILKAMIN
Technical Support Centre (TSC).
• Other types of installations are not advised
from those for which the boiler
was intended.
• Ensure the hydraulic system is perfectly
sealed and does not have any water leaks or
pressure drops.
• Ensure the shut-off valves on the system are
open.
• Ensure all the air inside the system is purged.
• Ensure there are no obstructions on the chim-
ney flue and combustion air inlet.
• Ensure pressure in the circuit is at least 1.0
bar.
• Ensure the combustion chamber is free and
clean.
• Ensure the crucible is positioned correctly.
• Check the electrical connection (230 V – 50
Hz) and power the boiler.
• Check the display is lighting on the command
panel.
INSTRUCTIONS FOR USE
- 76
FUEL LOADING
Before proceeding to loading the fuel inside the
tank, ensure that:
• the fuel is dry and not damp.
• the fuel is not stored near heat sources or
damp places which are not ventilated;
• if the fuel is not compliant with requirements
planned by the pellet standards:
1. Ö-Norm M 7135;
2. DIN plus 51731;
3. UNI CEN/TS 14961.
Adjust the recipe based on the characteristics
of the fuel (see page 70).
Fuel loading must be manual. The tank can
contain approximately 70 Kg of fuel.
Open the upper door and load the fuel (see
figure below).
-

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Laguna m 33

Tabla de contenido