A) Hot water supply to the system (G3/4" F)
B) Water return from the system (G3/4" F)
C) Circulator
D) Safety valve (G3/4"F)
E) Boiler drain tap
F)
Closed expansion tank
G) Anti-condensation valve
H) Vent valve
I)
Pressure gauge
5.8.1 Hydraulic connections
•
prepare a drain pipe, of suitable diameter,
to which the safety valve (D) should be
connected.
•
prepare the hoses supplied with their taps
on the relevant attachments of the heating
system
•
pass the hoses around the rear of the stove
•
position the stove
•
open the lower doors and remove the lower
•
connect on the front the hose taps to the
relevant supply attachments (A) and (B)
After performing the connections, feed the boiler
from the from the respective tap with tube holder,
again from the front.
Bleed the boiler from the upper valve (H) monitoring
the pressure 1-1.2 bar cold).
If necessary, ensure that the closed expansion
tank (F) is correct.
B
I
C
E
A
D
It is good practice to wash the system before making
the system operational.
durability of the product, a softening system is
recommended to ensure water hardness less than
25-27 French degrees and where necessary to
add anti algae products to the system water.
F
H
G
A
B