Rotex RKHBRD011ABV1 Manual De Instalación página 60

Unidad interior para bomba de calor de aire-agua
Ocultar thumbs Ver también para RKHBRD011ABV1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 223
It is very important to keep good visibility of the
manometer. The position of the manometer can be
changed as shown in the figure below. Make sure that
the capillary tube does not come in contact with sharp
edges and prevent bending of the capillary tube as
much as possible.
Change the position of the manometer when
piping is on the left side of the unit
1
2
3
5
Mounting of the manometer against a wall (the 2
screws are field supply).
1x
1
2
Perform the piping work as described in the chapter "Piping
connection work" on page 12.
Fill the system with water as described in the chapter "Charging
water" on page 14.
Perform the electrical wiring work as described in the chapter
"Electrical wiring work" on page 15.
To make the casing completely sealed, plug the knock-out holes
with putty or insulation materials (to be prepared on-site).
Perform the pre-operation checks as described in the chapter
"Start-up and configuration" on page 19.
Installation manual
11
3
4
6
5
2x
3
Close the unit
1 Fix the top panel on the unit with the appropriate screws.
4x
2 Fix the front and remaining side decoration panel(s) back to
the unit using the appropriate screws.
2x
3 Stick the top plate insulation (accessory) at the inside of the
top decoration panel according to the figure below.
1
3
4 Fix the top decoration panel on
top of the unit using the
appropriate screws. In case a
domestic
hot
water
tank
(optional) is installed, refer to
the domestic hot water tank
installation manual.
Indoor unit for air to water heat pump system
2
4
2x
RKHBRD011~016ABV1+Y1
4PW61218-1C – 2012.06
Tabla de contenido
loading

Tabla de contenido