Sammic SP Serie Manual De Instrucciones página 4

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
This manual describes the installation,
operation and maintenance of the SP-
23/B/BP, SP-290/B, SP-350/B, SP-550/B/BP,
SP-800/B dishwashers.
The model reference and its specifications
are shown on the identificacion plate
located in the machine.
Models "B": equipped with a drain pump.
Models "BP": equipped with an Air gap-
Break Tank and a rinsing booster pump.
These machines have been designed and
manufactured in accordance with the
following European directives for safety:
89/392/EEC and 73/23/EEC.
These appliances comply with the EN55014
and
EN55104
standards
suppression and exemption of radio-
frequency interferences.
INSTALLATION
For optimum performance and long service
life of the machine, follow the instructions
contained in this manual rigorously.
Water connection
Before proceeding with the installation of
the machine, check and make sure that:
1. The mains water connection is within
1.50m from the foreseen location of
dishwasher.
2. At its end on the machine side, the water
supply connection is equipped with a
3/4" GAS stopcock for the coupling of
the water supply hose supplied with the
machine.
3. The dynamic pressure of the water
supplied to the machine is not less than
2 bar (200kPa) and not greater than 4
bar (440kPa).
4. For good washing results, the hardness
of water (lime) must not exceed 10
hydrotimetric degrees.
5. In places where the water pressure is
higher than the specified one, it will be
necessary to incorporate a pressure
reducer to bring the service pressure
within the limits of 2 to 4 bar (200 and
400kPa).
6. If the water pressure is less than 2 bar, it
will be necessary to install a pressure
booster.
7. Avoid bottlenecks with hoses when
making this installation.
8. On
models
with
gravity
connect the drain pipe of an O.D. of
30mm to the sewage system. The
distance from the sewage system to the
machine base shall not exceed 120mm.
4
ENGLISH
9. On models 'B' equipped with a drain
pump, the distance from the sewage
system to the machine base shall not be
greater than 1m.
10. In order to ensure complete drainage, it
is essential that the machine is even. To
level it, undo or screw in the levelling
feet.
11. Models "BP": The inlet solenoid valve
includes a flowrate controller different
from the standard model, as stated on
the spare parts list. This model is
capable of operating at an input water
pressure ranging from 0.7 to 5 bar and
a minimum supply of 7l/min.
for
the
Machine installation with a water softener
If the lime content of the water is higher
than 10 degrees of hardness, install a
SAMMIC water softener. The installation
instructions of this device come with it.
Avoid bottlenecks before and after this
installation as flow would be reduced
producing loss of pressure.
Machine installation with a booster pump
Where the inlet water pressure is lower
than 2 bar (200kPa), install a booster
pump.
The booster pump may be installed
anywhere near the machine, approaching
the water piping and corresponding 3/4"
cock to the device. Ensure that the water
cock is still accessible.
Connect one end of the booster pump to
the water cock and the other end to the
hose supplied with the machine.
Electric installation
Single-phase machine: SP-23/SP-290/SP-
350
1. Check whether the voltage of the
machine coincides with the mains
voltage.
2. Install a 20A (1P+N) switch of the
magnetothermal type. The machine is
equipped with a cable of a cross section
of 3x2.5mm² and 1.70m in length. This
cable must be connected directly to the
switch.
Three-phase machines: SP-550/SP-800
1. Check whether the voltage of the
drainage,
machine coincides with the mains
voltage. Series-production machines are
delivered, prepared with a 400V/3N
connection.
2. Install a 25A (3P+N) magnetothermal
switch. The machine is equipped with a
cable of a cross section of 5x4mm² and
1.70m in length. This cable must be
connected directly to the switch.
3. Changing connections for a 230V/3-
phase supply:
· Disconnect the neutral (blue wire) of
the power cable from the connecting
strip.
· Connect the bridge to the connecting
strip as shown on the wiring diagram.
· Change the connections at the heating
resistor of the boiler, placing the
bridges included in the supply as
shown on the wiring diagram.
4. EARTHING is OBLIGATORY. Moreover,
the machine includes an external screw
for
its
connection
to
equipotential system.
OPERATION
Starting
1. Open the 3/4" G stopcock to allow water
to enter the machine.
2. Turn on the switch. Turn on the booster
pump if one has been incorporated to
the machine.
3. Check that the inlet filter and the drain
plug are in place.
4. Turn the switch control (A) to the ON
position for the automatic filling of the
wash tank and the connection of the
heating elements.
5. The light indicator (C) turns on when the
washing temperature (55/60ºC) has
been
reached.
Now
introduce
detergent into the tank: 1/4 coffee cup
at the beginning of the first cycle and a
same
amount
every
approximately.
6. After putting the rack full of dishware
into the machine, close the door. Press
the backlit 'Start' push-button (B). A
washing cycle starts automatically. The
lamp turns off on completion of the
cycle.
7. Models with a drain pump: With the door
open, press the push-button (D) to start
the drain pump. With a drain plug in
place, any excess amount of water
accumulated in the wash tank will be
evacuated.
8. Models "BP":
SP-23BP: When installing the machine
and for the first filling, turn the main
switch on, with the door open, allowing
the Break-tank and boiler to be filled.
Next, close the door in order that the
wash tank is filled by means of the
a
ground
the
5
cycles

Hide quick links:

Tabla de contenido
loading

Tabla de contenido