Connect the control panel cable, 230 V lead, and heating
element cable as shown in the circuit diagram.
1 = Control panel
2 = Supply line 3 x 1.5 mm²
3 = Heater element
4 = brown
5 = green
6 = blue
7 = yellow
8 = white
9 = yellow / green
All cables must be secured with cable clips!
12
Function check
The water connections must be checked for leaks and all func-
tions must be tested as described in the operating instructions
after installation.
Then it must be ensured that all of the water (5 litres) drains
when the system is emptied.
There shall be no claims under guarantee for damage
caused by frost!
The operating instructions must be handed to the owner of
the vehicle.
Warning information
The yellow sticker with the warning information, which is
enclosed with the appliance, must be affixed by the installer
or vehicle owner to a place in the vehicle where it is clearly
visible to all users (e.g. on the wardrobe door)! Ask Truma to
send you a sticker, if necessary