Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
6 STANDARD PROGRAMMING

1 Power Supply

When turned on, "
", "
sequence followed by the closed gate symbol "- - - - ".
*
If the control panel has already been programmed and the power fails or is switched off - once power is returned and a START command
is given, the position reset procedure is performed (see "rESP" in the table "WORKING STATUS MESSAGES" on page 33.
2 Visualisation of inputs and operations-counter status
1. Scroll the parameters with the
screen reads P013;
2. Access the parameter by pressing the
3. The "Input Status" is shown on the screen (check that
this is correct):
4. Press the
button again;
5. The "Total Operation Counter"
screen followed by the
To calculate the number of completed operations, the
two values must be multiplied.
I.e.:
= 120x10 = 1200 operations completed
6. Press the
button again;
7. The "Total Maintenance Counter"
screen followed by the
To calculate the number of operations remaining before
the maintenance request, the two values must be
multiplied.
I.e.:
= 1500x1 = 1500 operations yet to be
completed before the maintenance request
8. Press the
button again to exit the parameters (P013
is shown on the screen again).
" (or the current firmware version) "
and
keys until the
button;
appears on the
multiplier.
appears on the
multiplier.
", "
" (or the selected Type) appear on the display in
27

Hide quick links:

Tabla de contenido
loading

Tabla de contenido