Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 30

Ocultar thumbs Ver también para INTEGRAL POWER II:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
EN
Place danger stickers at the cable joint and on
7
the cabin lifting device.
7
Connection to alternator cable for unit operation with
Caution: The cable will be installed in all
!
vehicles for the unit to work with the engine
started up.
Position excitation cable on the inside or
8
outside of the vehicle as appropriate, and
secure the front with the supplied self-tapping
screws. Connect switches as shown.
Air speed
switch
8
the engine running
A/C switch
On the inside
30
7
8
On the outside
Tabla de contenido
loading

Tabla de contenido