Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 23

Ocultar thumbs Ver también para INTEGRAL POWER II:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
Connect the equipment wiring with inner
10
air distribution panel making the boxes and
colours coincide.
Place the inner air distribution panel on the
11
previous studs with (1) wide brimmed M6
washer and (1) M6 nut on each stud. Tighten
nuts until channelling duct meets with the
upper foam of the equipment.
Important: The foam channelling duct must
meet the upper foam of the equipment to
prevent air leaks.
11
EPDM
seal
Cabin ceiling
Upholstering
Position the console and align the unit. Once
12
aligned, remove the console.
Base
D
(A)
M6 Nut
M6 stud
1 mm.
M6 Hexagons
11
Rubber ductings
12
23
Foam
Interior air
distribution
panel
EN
Tabla de contenido
loading

Tabla de contenido