POWR
CYLINDER
EXPLODED DIAGRAM
23 Nm (2.3 mSkg, 17 ftSlb)
1st
2nd
40 Nm (4.0 mSkg, 29 ftSlb)
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
CYLINDER REMOVAL
Cylinder head
1
Bolt (with washer)
2
Cylinder
3
Pin
CYLINDER
Q'ty
Follow the left "Step" for removal.
Refer to "CYLINDER HEAD"
NOTE:
6
Tighten the bolts in sequence and in two
steps of torque.
NOTE:
1
After installing, check the smooth
movement of the piston.
2
Reverse the removal steps for
installation.
26
Service points