Tecnotest Smart Charger Manual Operativo página 44

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
SMART CHARGER _________________________________________________________________________
In case the voltage of the battery to be recharged is lower than the limits, a pre-charge
of 5 minutes can be carried out manually, adopting the preset voltages indicated in the
"Power supply unit" section.
Once the battery voltage has been increased, the chosen type of charge can be
attempted.
Press START to start the charge.
The following menu is displayed:
where:
Standard = battery being charged previously selected by the operator.
t = time from the beginning of the charge expressed in hours/minutes.
Temp. = standard average value of battery temperature if the probe is not present.
Temperature measured by PT100 probe (option) connected to the battery being in
charge expressed in °C. Values of charge thresholds are updated to the measured
temperature.
V = voltage measured at the battery charger output in Volts.
I = current distributed by the battery charger in Ampere.
CHARGING = short indication of the battery charger operating status for instance
START, CHARGING, ERROR, etc.).
IUoU = profile of charge curves (the currently executed phase flashes).
NOTA BENE:
The battery charging cycle can be stopped at any moment by pressing STOP.
At the end of the charging phases the battery charger goes automatically to the
BUFFER CHARGE (see chapter 8.1), when the battery is completely recharged.
Press STOP before detaching tongs.
40
Battery rated
voltage (V)
6
12
24
Standard
t: 0:01
V: 13,5
CHARGING
Preset voltage (V)
6,3
12,6
25,2
Pb
Temp.: +20 ^C
I: 2,1
IUoU
OPERATING INSTRUCTIONS
Tabla de contenido
loading

Productos relacionados para Tecnotest Smart Charger

Este manual también es adecuado para:

5880

Tabla de contenido