Mid - Conformity Declaration; Safety Instructions; Electro-Magnetic Interference; Care Instructions - Zenner Zelsius C5-ISF Manual De Montaje E Instrucciones

Medidor electrónico compacto de calefacción y/o refrigeración
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Deutsch
English

MID - Conformity declaration

zelsius
C5-ISF is produced and
®
tested in compliance with the new
European Measuring Instruments
Directive 2014/32/EU (MID). Accor-
ding to this directive, devices are no
longer carrying an initial verification
stamp, but rather the year of the
device's declaration of conformi-
ty (recognizable on the front of the
device, for example: M16). The MID
controls the use of heat meters up to
the moment they are placed on the
market resp. their first putting into
use. After this, the national regula-
tions for devices subject to compul-
sory verification apply within the EU.
The duration of initial verification
validity in Germany remains 5 years
for heat meters. After this period has
expired the measuring device may
no longer be used for billing in com-
mercial use. The regulations resp.
validity period may vary in other
countries of the EU.
If you have questions, please direct
them to
The declaration of conformity is
attached to each measuring instru-
ment. The latest information about
this product can be accessed or
downloaded from

Safety instructions

Electro-magnetic interference

zelsius
C5-ISF fulfils the national
®
and international requirements for
22
Français
www.zenner.com
interference resistance. To avoid
malfunctions due to other interferen-
ces, do not install fluorescent lamps,
switch cabinets or electric devices
such as motors or pumps in the im-
mediate vicinity of the meter. Cables
leaving the meter should not be laid
parallel to live cables (230V) (mini-
mum distance 0.2m).

Care instructions

Clean plastic surfaces with a damp
cloth only. Do not use any scouring
or aggressive cleaning agents! The
device is maintenance-free during
the service life. Repairs can only be
made by the manufacturer.

Installation instructions

Safety instructions for instal-
lation
Read these instructions carefully
right up to the end before starting
to mount the deice! The installation
has to be done by qualified profes-
sional personnel. The current laws
and regulations have to be obser-
ved, especially the PTB technical
guidelines K8 und K9, EN1434 part
1+6, (in Germany also AGFW direc-
tive FW202, FW510, FW218 and
DIN4713 part 4 and the initial veri-
fication directive). At devices with
M-Bus the general rules of techno-
logy and the respective regulations
for electrical installations have to be
followed. Make sure no heating wa-
ter escapes during installation – this

Hide quick links:

Tabla de contenido
loading

Tabla de contenido