3.2.4 Grid Code File

INFORMATION
If the desired grid code is not available, or if the
LCS-Tool displays a warning about incompatible
software versions, the grid code and software library
must be updated on the LCS-Tool.
It is possible to create customer-specific grid code
files with adjusted set values. For this purpose, please
contact SMA Technology AG.

3.2.5 Configuring the Fallback

If the communication between the inverter and the SMA
Inverter Manager is interrupted, the inverter switches to a
previously defined operating state (Fallback). The desired
operating state when communication is interrupted, can be
activated and configured with the customer-specific grid
code file or via the LCS-Tool. For further information on the
configuration of the system fallback between the SMA
Inverter Manager and a superior control unit (e.g. SCADA
system or Power Plant Controller) see installation manual of
the SMA Inverter Manager / SMA Digital I/O Box /
LCS-Tool.
INFORMATION
Observe the specifications of your electric utility
company.
Parameter
Switch-on time after interrupted
communication
Length of fallback
Reaction P
Reaction Q
(Q has a higher priority than P)
Table 3.3 Configurable parameters after communication interruption
Installation Guide
Configurable
value range
2 to 20 sec.
0 to 100 days
0 to 100%
0 to 100%
3 Initial Setup and Start
SHP75-10-STP60-10-IA-xx-18
33
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60

Tabla de contenido