Plumbing Installation - continued
Figure 1
Two Jet (10" - 12" from center to center)
10" - 12" de centro a centro
Figure 1A
Three Jet (10" - 12" from center to center)
NOTE: Suction lines which are too long have significant disadvantages:
Higher resistance which results in less efficient priming and a higher risk of cavitation.
n
Longer priming time (up to 12 min).
n
Keep the suction and pressure lines as short and straight as possible.
n
If the pump is positioned further away, then the pipe dimensioning has to be adapted so that almost loss-free flowing
n
is ensured.
70
60
50
40
30
20
10
0
~
180
200
U.S. Gallons per Minute
Figure 2
BaduStream II Head Loss Curve (Single Jet Housing)
10" - 12" from center to center
10" - 12" de centro a centro
220
240 260
280
300
Figure 3
BaduStream dimensional drawing
9.25"
0.79"
3.25"
1.97"