Dimensioning of the power supply line
When dimensioning the power supply line also observe the possible reduc-
tion factors and the increased environmental temperatures inside the con-
nection area of the charging station (see temperature rating of the supply
terminals)! Under certain circumstances, this can lead to an increase of the
cable cross-section and to the adaptation of the temperature resistance of
the power supply line.
7.3.1

Cable installation

Note the following points during cable installation:
Correct cable gland (surface-mounted cable
installation)
Installation manual V1.01
© EATON
The supply line must be sufficiently inserted into the cable gland (sur-
face-mounted cable installation) or the double-membrane seals (flush-
mounted cable installation) so that the cable sheath
connection area.
The double-membrane seals must fit cleanly against the cable sheath-
ing.
Make sure that the connection cables are inserted centered, straight and
without pressure through the double-membrane seals to ensure seal
tightness.
The installation pipe or cable conduit with the feed line may not be
screwed together in the cable gland (above) or run through the double-
membrane seals (behind).
The supply line must be routed straight through the cable gland resp. the
double-membrane seals in compliance with the bending radii (approx.
cable diameter times 10).
For surface-mounted cable installation, the cable gland must be installed
properly and screwed together sufficiently tight.