Installation Of Outdoor Unit - Haier HSU-09RD03/R2 SDB Manual De Instalación

Ocultar thumbs Ver también para HSU-09RD03/R2 SDB:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.Installation of Outdoor Unit

Drawing for the installation of indoor and outdoor units
Install according to
2.Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,and the bending radius
should be 30 to 40 mm or longer.
Connecting the pipe of gas side first makes working easier.
The connection pipe is specialized for R410A.
Half union
Spanner
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 5m, the function of the unit will be affected. If the pipe has
to be lengthened, the refrigerant should be charged, according to 20 g/m. But the charge of refrigerant
must be conducted by professional air conditioner engineer. Before adding additional refrigerant,
perform air purging from the refrigerant pipes and indoor unit using a vacuum pump,then charge
additional refrigerant.
B
A
Outdoor unit
CAUTION
Max.Elevation: A
max
In case the elevation A is more than 5m,
oil trap shoud be installed every 5~7m
3.Connection
Use the same method on indoor unit. Loosen the screws on terminal block and insert the plugs fully into
terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor unit.
If wiring is not correct, proper operation can not be carried out and controller may be damaged.
Fix the cable with a clamp.
4.Attaching Drain-Elbow
If the drain-elbow is used, please attach it as
figure. (Note: Only for heat pump unit.)
Outdoor unit
Flare nut
Torque wrench
Outdoor unit
Indoor unit
A
=10m
Forced fastening without careful
centering may damage the
threads and cause a leakage of
gas.
Pipe Diameter
Liquid side 6.35mm(1/4")
Gas side 9.52mm(3/8")
Outdoor unit
B
Indoor unit
In case A is more than 5m
Max. Length:
B
=15m
max
In case the pipe length B is more than 10m,
the refrigerant should be charged, according to 20 g/m.
6
Fastening torque
18N.m
42N.m
Oil trap
B
Indoor unit
A
Tabla de contenido
loading

Este manual también es adecuado para:

Hsu-12rd03/r2 sdb

Tabla de contenido