INSTALLATION INSTRUCTIONS
A. Prepare the Outdoor Unit for Installation
• Remove all packaging.
• Place supplied vibration pads onto outdoor unit's feet.
• Use team lift to place the unit on a solid foundation, 8" above the average snowfall.
Correct
Installation
Correct
Installation
Minimum height(H) should be higher than the highest
snowfall depth(D)(H=D+8")
20
Step 3 - Installation of the Outdoor Unit
Drainage
Incorrect
Installation
Drainage
Stand top is
covered
Incorrect
Installation
Unit may become covered in snow if the stand height is insufficient.
Drainage
clearance is too
small, causing
inadequate
drainage.
31-5000564 Rev. 3