Replacement Parts - Grohe Blue Starter Kit 33 249 Manual De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
» Set the flow rate (factory setting: 4.5 l/min), see
Fig. 10:
1. Place measuring beaker (1 litre) under the
spout.
2. With a finger, cover green (2) and red (3)
indicator lamps on control unit simultaneously
for 6 seconds.
The indicator in the rotation handle (1) of the
fitting flashes red.
3. Open rotation handle fully within 2 minutes
and draw off exactly 1.0 litre of filtered water.
4. Close rotation handle.
5. Quickly tap one of the two indicator lamps
twice with a finger.
Both indicator lamps flash on and off 4 times and
then remain on.
Repeat the entire process if the indicator lamps do
not flash on and off. Possible causes:
– Time expired (2 minutes)
– Flow rate too slow or too fast
(< 1 l/min or > 6 l/min)
– Tapping did not register
The fitting is now fully installed and ready for
operation.
Operation, see Fig. 11
» Open lever (3) to draw mixed water.
» Open rotation handle (1) to draw off filtered
water. The indicator in the rotation handle
indicates the filter capacity:
Filter capacity indicator (2) in rotation handle:
Flashing signal
Note:
Replacement filter cartridges can only be
ordered at www.groheblue.grohe.com.
Meaning
Filter capacity of more
than 10%
Filter capacity of less
than 10%
» Order filter cartridge
Filter capacity of less
than 1%
» Change filter cartridge
soon
» No filter capacity
» Change filter cartridge
immediately
Maintenance
Inspect and clean all components and replace if
necessary.
Important:
Risk of damage:
Always disconnect the power supply
before carrying out maintenance work on
the fitting. The plug-in connectors can
then be disconnected, see Fig. 7.
Cartridge, see Fig. 12.
1. Shut off hot and cold water supply.
2. Lever out plug (6) and remove set screw (5).
3. Remove lever (4) and cap (3).
4. Remove screw coupling (2) and take out
cartridge (1).
When installing the cartridge, ensure that the seals
are correctly seated. Screw in screw coupling and
tighten.
Ceramic headpart, see Fig. 13.
1. Shut off hot and cold water supply.
2. Close rotation handle (1) and remove.
3. Remove display component (6).
4. Remove snap insert (2) and stop (3).
5. Replace complete ceramic headpart (5)
or O-ring (4).
Assemble in reverse order. Note the installation
position of the stop.
Mousseur
Remove and clean mousseur (64 374), see
fold-out page V.

Replacement parts

Replacement parts, see fold-out page V.
7
Tabla de contenido
loading

Tabla de contenido