Installation Procedure - Toto YG20012R Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Use the attached template for location and make sure that all the screws
mount into wood studs. A stud sensor or another stud locating method
can be used to locate the studs behind the wall.
Stud,
Back Support
2. Drilling mounting holes.
For Drywall:
• Drill a 4mm (5/32") holes at each marked location.
For Ceramic Tile:
• Drill 8mm (5/16") holes - a minimum of 60mm (2
marked location.
• Insert anchors until they are flush with the face of the finished wall.
• Apply silicone sealant into all drilled holes.

INSTALLATION PROCEDURE

Stud
Mount Location
Stud,
Back Support
Wall Mount Screw
Stud,
Back Support
Mount Location
") deep at each
3/8
Cap Nut
Cap Nut
<Side View>
5
Stud,
Back Support
Hole,
Mount Location
Finished Wall
Tabla de contenido
loading

Tabla de contenido