Preparing The Machine For Operation - EMAK Oleo-Mac Cheyenne 92 Manual De Uso

Ocultar thumbs Ver también para Oleo-Mac Cheyenne 92:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 199

3. PREPARING THE MACHINE FOR OPERATION

3.1 Unpacking and inspecting the contents
The riding mower is supplied wrapped and in crate packaging. For transportation reasons some machine
assemblies are disassembled at the production plant and it is necessary to install them before putting
the machine into operation. The unpacking and preparation for operation is performed by the seller
within the scope of the pre-sale service.
Inspect immediately after delivery that the packed machine has not been damaged. In
the event of damage inform the carrier. If the complaint is not lodged in time, no potential
demands can be claimed.
Check that the machine model is the same as you ordered. In the event of an irregularity
do not unpack the machine and immediately report this discrepancy to the supplier.
1. Crate packaging
2. Riding mower
3. Folding frame
4. Steering wheel
3.1
5. Documentation
6. Front bumper bar
Using a suitable tool (e.g. crowbar or hammer, etc.) remove the crate (1) and the packaging on the
machine.
Visually inspect the machine and assemblies for damage that may have occurred during transport.
Unpack all separately packed assemblies and inspect them.
The following assemblies are supplied in every package:
u Riding mower (2)
u Assembled folding frame, separate from the machine (3)
u Steering wheel (4)
u Documentation (5) (packed parts list, user's manual for the riding mower, user's manual for the
engine, user's manual for the battery, service log book and joining material)
u Front bumper bar (6) is loosened and slid into the frame of the machine.
71
Tabla de contenido
loading

Este manual también es adecuado para:

Oleo-mac cheyenne 110Efco tonkawa 92Efco tonkawa 110

Tabla de contenido