Sony VPL-GTZ1 Manual De Referencia página 38

Ocultar thumbs Ver también para VPL-GTZ1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
Installing the Unit (On a
ceiling)
For customers
CAUTION
When mounting the projector to the ceiling
or moving it to a different location, do not do
so by yourself.
For dealers
Be sure to read "Safety precautions for
installing the unit on a ceiling" (page 11).
1
Loosen the nut and remove the feet
(six points).
Nut
Bottom of the unit
2
Attach an M8 bolt (60 mm or longer)
and a washer then fasten the nut. (The
recommended fastening torque: 12.5
N•m)
Nut
The amount of bolt insertion into the
unit: from 10 mm to 50 mm (
inches to 2 inches).
10 mm to 50
mm
13
(
/
inches
32
to 2 inches)
16
GB
M8 bolt
Washer
13
/
32
M8 bolt
Nut
Washer
For details about the attachment position of
the M8 bolt, refer to "Dimensions" in the
Operating Instructions contained in the
supplied CD-ROM.
For more information, refer to
"Connections and Preparations" in the
Operating Instructions contained in the
supplied CD-ROM.

Capítulos

Tabla de contenido
loading

Tabla de contenido