Step 1 : Lower Rail Assembly
Before undertaking lower rail assembly (EE), place the wall (JJ), sand, and hardware (KK, LL, MM) inside the enclosure.
If the pool is not on a concrete slab, place an approximately 30 x 30 x 5 cm slab at each lower rail connection point. These slabs must be such
that their upper side is exactly at ground level (Figure 1).
WARNING
Bag of fasteners
Wall
E
Slabs 30 x 30 x 5 cm
Slide the rails (DD) in the connection plates (820 121) leaving space A (see table) between the rails (II) in the centre of the connection plate
(820 121).
Step 2 : wall and posts installation
WARNING
PLEASE NOTE
In order to enter or exit the pool during installation, please use the pool
ladder (if provided).
Place the wall (JJ) on a plank in order to facilitate unrolling.
Start to thread the wall (JJ) in the rail groove in the middle of a
connecting plate (820 121) so that the attachment bolts are hidden
by a post and continue until the wall is fully unrolled.
If the wall is too long or too short, adjust it evenly with the free
space in the connecting plates (820 121) (Figure 1).
Join the wall extremities (JJ) using screws, nuts, and washers.
The screw heads must be on the inside and the nuts on the outside.
Use all bolt holes. It is very important to tighten the bolts so as to obtain
a solid joint.
In order to protect the liner, a x a protective strip (example: adhesive
tape, not provided) on the hardware inside the pool.
3 – Pool Assembly
It is important that the connecting plate's (820 211) entire surface press rmly against a at slab,
using an excessively short slab or no slab at all could make the installation inadequate or cause
the pool to collapse.
Sand
Figure 1
An incorrectly mounted wall (YY) may cause the pool to collapse. Do not install the wall when
there is wind.
In order to increase the wall's rigidity and stability (JJ) temporarily place the upper metal rails
(EE) and the vertical posts (BB) as you install the wall (YY). Ensure that the cut-out for the
skimmer is located at the top of the wall (JJ), this cut-out must be positioned opposite the
dominant wind, so that the wind brings impurities to the skimmer.
820 121
A
10
7
121 510
121 610
64 Notice N°880101 Rev B
EE
interior
A = cm
Dimensions
2,45
3 à 4
2,90
2 à 3
3,60
1 à 2
4,65
1 à 2
5,55
1 à 2
10