5.3.4. Connecting the AC outlet.
Before connecting to the grid, make sure that the voltage and
frequency of the grid meet the inverter's requirements. Please refer
to the technical parameters for more details.
This inverter includes a built-in residual current device (RCD).
If an external residual current device (RCD) is used, a type A device
must be used, with a trip current of 30 mA or more.
The recommended AC cord and switch for the EQX series single-
phase inverter is shown in Tab. 9:
Model
EQX2 2001-S
EQX2 3001-S
EQX2 3002-S
EQX2 3002-SX
EQX2 4002-S
EQX2 4002-SX
EQX2 5002-S
EQX2 5002-SX
EQX2 6002-S
EQX2 6002-SX
EQX2 8002-SX
EQX2 10002-SX
Tab. 9. Circuit breaker gauge and cable cross-sections, by model.
Steps for connecting the AC connector.
1.
Extract the AC connector from the accessory bag and dis-
a.
assemble it, following the steps marked on Fig. 27:
Insert the plastic piece into the holes marked in red
and pull the connector head out.
The fully disassembled AC connector is shown below:
AC terminal
Threaded sleeve
head
Fig. 27. AC connector.
USER MANUAL
Cable (mm
)
2
2,5
4
6
10
Cable gland
According to the above table, select a suitable cable, re-
b.
move the insulation sleeve from the AC cable about 50 mm,
and remove the insulation from the end of the L/PE/N ca-
bles about 8 mm, as shown in Fig. 28:
Cable diameter: 10-14 mm.
Strip ped len gt h: 8 mm.
50 mm.
Fig. 28. Cable stripping.
Insert the stripped end of the three cables into the cor-
c.
responding hole of the terminal head (yellow-green cable
into the PE port, phase into the L port and neutral into the
N port). Pull from the cable to check that it is properly con-
nected, as shown in Fig. 29:
Allen wrench
Fig. 29. Inserting the bare wire into the terminal.
According to the direction of the arrow, push the threaded
d.
sleeve until it connects to the AC terminal head, and then
turn the cable gland clockwise to lock it, as shown in Fig.
30:
Fig. 30. Connecting and fastening the sleeve on the AC
terminal.
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID