cecotec ENERGYSILENCE AERO 5290 NATURAL Manual De Instrucciones página 46

Ventilador de techo
Ocultar thumbs Ver también para ENERGYSILENCE AERO 5290 NATURAL:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
ENGLISH
2. BEFORE USE
-
This appliance is packaged in a way as to protect it during transport. Take the appliance
out of its box and remove all packaging materials. You can keep the original box and other
packaging elements in a safe place. This will help you prevent damage to the appliance
when transporting it in the future. In case the original packaging is disposed of, make sure
all packaging materials are recycled accordingly.
-
Make sure all parts and components are included and in good conditions. If there is any
piece missing or in bad conditions, contact the official Cecotec Technical Support Service
immediately.
Box content
-
Fan
-
Assembly kit
-
Remote control
-
Batteries (2*AAA)
-
Instruction manual
3. OPERATION
Pre-assembly preparation
-
To prevent personal injury and damage, make sure that the location where the appliance is
going to be installed allows a 2.3-metre clearance from the blades to the floor and a 76-cm
clearance from the blades to any wall or object. Fig. 3
-
Make sure that the building structure can hold the full weight of the fan.
-
This fan can be installed on a normal or vaulted ceiling with a downrod. The hanging length
of the fan can be extended with a longer rod.
-
Ensure that the junction box is securely fastened to the building structure and can support
the full weight of the fan.
-
Installation requires the following tools: screwdriver, flat screwdriver, adjustable pliers or
spanner, ladder, wire cutters and electrical tape.
-
This fan can be mounted with a rod on a normal or vaulted ceiling. Fig. 4
Fig. 4 key:
Standard assembly
A.
B.
Pitched roof mounting
Hanger bracket installation
Wooden ceiling. Fig. 5
Concrete ceiling. Fig. 6.
46
ENERGYSILENCE AERO 5290 NATURAL
loading

Este manual también es adecuado para:

08472